COMPLETED PROJECTS
1.TIGO TANZANIA

DESCRIPTION- Installation of Rectifiers

LOCATION- Various Cell Towers in Tanzania

PERIOD- October 2015 to April 2016

2. WENT WORTH GAS LTD

DESCRIPTION-  Inter Office Telephone System Installation (PABX)

LOCATION- Masaki Dar es salaam

PERIOD- May 2015

3. UNIVERSITY OF DAR ES SALAAM

DESCRIPTION- Fault Tracing and Rectification on Inverter System.

LOCATION- Geography Department – University of Dar es salaam

PERIOD- June 2015




4.ACCESS WORLD

DESCRIPTION- Repair, Maintenance and

 Device Caretaker of Electrical and

 Mechanical Equipment.

LOCATION- Tabata Dar es salaam

PERIOD- June 2017

5. ALAF LIMITED

DESCRIPTION-  Changing of busbar conductor,Disc Insulators and connectors for Substation

LOCATION- Tazara – Dar es salaam

PERIOD- July 2020

6. NAKUROI INVESTMENT LTD

DESCRIPTION- Fault Tracing and Rectification on Inverter System.

LOCATION- Geography Department – University of Dar es salaam

PERIOD- June 2015

7. GOLDEN HEIGHTS

DESCRIPTION- Dual Tariff check meter Installation

 LOCATION- Masaki Dar es salaam

PERIOD- December 2017 to January 2018

8. TANGA PHARMACEUTICAL & PLASTICS LTD

DESCRIPTION-  Supply & Installation of Metering Unit

LOCATION- Tanga

PERIOD- August 2018

9. CRJE

DESCRIPTION- Supply, Installation, Testing and Commissioning of UPS

LOCATION- Kigamboni - Dar es salaam

PERIOD- December 2017

10. BUSINESS CONNECTIONS T . LTD

DESCRIPTION- Supply and Installation of Conference Telephone and Wireless Microphone

LOCATION- Mikocheni Dar es salaam

PERIOD- March 2019

11. NEELKANTH SALT

DESCRIPTION-  Installation and Commissioning of Metering Unit & Transformer

LOCATION- Mkuranga – Coast Region

PERIOD- March 2020

12. JOSIC CO. LTD

DESCRIPTION- Installation, Testing and Commissioning of Generator Sets

LOCATION- Holland House and Zanaki - Dar es salaam

PERIOD- May 2016

13. CHAI BORA

DESCRIPTION- Supply and Installation of Va Ups

LOCATION- Pugu road - Dar es salaam

PERIOD- August 2019

14. ASHER’S INDUSTRIES

DESCRIPTION-  Supply & Installation of Metering Unit, Transformer and MV Line Construction.

LOCATION- Tanga

PERIOD- September to November 2018

15. TPCC

DESCRIPTION-Supply and Installation of Cable tray & Termination Boxes for Power and Control Cables

LOCATION- Tegeta Dar es salaam

PERIOD- February 2018

16.TANESCO

                       1

DESCRIPTION-  Supply, Installation, Testing and Commissioning of heavy duty Air Conditioners.

LOCATION- Tegeta Gas Plant - Dar es salaam

PERIOD- November 2020

                          2

DESCRIPTION- Supply of ABC Conductors and other Electric Materials

LOCATION- Mbeya, Simiyu, Kigoma and Njombe Regions

PERIOD- October 2017 to April 2018

                            3

DESCRIPTION- Supply, Installation, Testing and Commissiong of Floor stand Air Condition.

LOCATION- Ubungo gas plant

PERIOD- 2021



2. NEELKANTH CHEMICALS

                             1

DESCRIPTION-  Supply & Installation

 of Metering Unit and HT Cable

 Termination

LOCATION- Tanga

PERIOD- August 2018

                              2


DESCRIPTION- Two Ends Sqr HT

 Cable Termination.

LOCATION- Tanga

PERIOD- August 2019

                              3


DESCRIPTION-  Changing

 termination kit and megaring the

 cable, Megaring Transformer both

 HT and LT sides, VCB repair,

 Switchgear maintenance and HT

 cable Connections.

LOCATION- Tanga

PERIOD- March 2020


3. UNIVERSITY OF DAR ES SALAAM

DESCRIPTION- Fault Tracing and Rectification on Inverter System.

LOCATION- Geography Department – University of Dar es salaam

PERIOD- June 2015

1.TIGO TANZANIA

DESCRIPTION- Installation of Rectifiers

LOCATION- Various Cell Towers in Tanzania

PERIOD- October 2015 to April 2016

2. WENT WORTH GAS LTD

DESCRIPTION-  Inter Office Telephone System Installation (PABX)

LOCATION- Masaki Dar es salaam

PERIOD- May 2015

3. UNIVERSITY OF DAR ES SALAAM

DESCRIPTION- Fault Tracing and Rectification on Inverter System.

LOCATION- Geography Department – University of Dar es salaam

PERIOD- June 2015